Demo
JRJ. Rivera

Organizational Effectiveness

SAFR-C-21 · ten indicators on the 4-point scale · target ≥ 3.60 · reviewed monthly

Core — buildable now
Org effectiveness score
3.42
▼ below 3.60 target
Personnel tracked
1,284
across 3 sites
Assessments this month
417
▲ 92% coverage
Safety-gate trips
6
require action

Ten organizational indicators

Aurora Data Campus · April

12-month trend

target 3.6
Climbing toward target — 3.42 now, +0.31 over the year.

Score distribution

Watching for grade compression — too many 3s starves the 3.6 target.
1 · 4%
2 · 14%
3 · 58%
4 · 24%
Drill down anywhere. Use the breadcrumb at the top — Campus → Building → Zone → Individual — to see this same scorecard at every level. Try clicking an individual.

Procedure Library

The SAFR publication, digitized · 4 series (Core / Admin / Electrical / Mechanical), ≈65 procedures · every document validated against the SAFR standard

Core — buildable now
DocumentTitleRevStatusQuality self-score
SAFR-C-10 Feedback, Coaching & Observations02 Needs remediation 2.4
SAFR-C-21 Organizational Effectiveness02 Needs remediation 2.7
SAFR-C-17 Equipment Sealing02 Needs remediation 2.3
SAFR-C-4Human Performance 02Clean3.4
SAFR-C-15Torque Practices 02Entity mismatch2.9
SAFR-M-3Vibration Data Collection (measured) 02?Rev mismatch2.6
SAFR-M-4Fuel-Oil Analysis (measured) draftUnreleased draft1.9
…and ≈57 more across the C / A / E / M series (≈65 total) — awaiting upload. E/M procedures carry machine-checkable acceptance criteria (ISO codes, ppm, torque values).
SAFR-A-1Performance Tracking & Trending Awaiting upload
SAFR-A-15Action Item Process Awaiting upload
Click SAFR-C-10, SAFR-C-17 or SAFR-C-21 to see the platform flag the real defects in your own source documents. The system holds your standards to your standard.

FCO Assessment

Live observation card · subject: T. Okafor (Technician) · Zone 3, Building A

Core — buildable now

Observation & Coaching

1 Unsat · 2 Needs Improvement · 3 Satisfactory · 4 Excellent

Overall card score

3.63
Excellent range

Weighted mean · Compliance & Safety weighted ×2.
Try this: set Safety Practices to 1. Watch the overall score — strong marks everywhere else will not rescue a safety failure. That's the Safety Gate.

My Training

Electrical Commissioning Technician · Qualification path

Core — buildable now
Path progress
62%
8 of 13 modules
Next deadline
May 14
Module 9 quiz
Certifications
3
1 renews in 40d
Avg exam score
88%
▲ above pass

Learning path

linked to SAFR procedures
Human Performance Fundamentals — Core 4
Reading + quiz·4
Error Precursors & STAR self-checking
Animation·3
9
Switchboard Energization — start-up procedure
Video + practice·in progressquiz due May 14
10
Concurrent Verification & meter wiring
Video·locked until M9
11
Integrated Systems Test (IST) overview
Reading

Current lesson

Video · Switchboard energization (4:12)

Reminders

Module 9 quiz due in 4 days
Arc-flash cert renewal — 40 days
Monthly safety briefing — Fri 7:00a

Facility Map & Wayfinding

Blueprint-aware location · geofenced safety · documents that apply where you stand

Vision — roadmap (needs site hardware)

Building A · Level 2

You are in: Zone 3 — MV Switchgear
Zone 1 · Controls Zone 2 · Battery (restricted) Zone 4 · MDA Zone 5 · Mechanical Zone 3 · MV Switchgear
⚠ Live safety alert
Energized MV equipment in Zone 3. Arc-flash PPE Category 2 required. Concurrent Verification in effect.
Positioning shown is illustrative. Real deployments tier this: QR/RFID (zone-level), BLE beacons (~1–3 m), UWB (cm-class) where hardware is installed. 3D view is a later phase.

Applies to Zone 3 right now

Auto-pulled by location
SAFR-C-10 Concurrent Verification standard
SAFR-A-1 Energized-equipment logging
Arc-flash PPE Cat. 2 · LOTO protocol
Switchgear walkdown (video, 6:40)

Find your way

Walking directions to Zone 4 · MDA — 2 min, 48 m. Avoids restricted Zone 2.

Document Onboarding

Load your corpus · the AI helper validates each asset and proposes improvements

Core — buildable now
Drag-and-drop accepted · auto-classified by type

Import pipeline

AI proposes · a human approves · nothing auto-publishes

Uploaded 2

SAFR-A-1
Tracking & Trending
SAFR-A-15
Action Items

Parsing 1

Blueprints
Building A · 4 floors

Needs review 2

SAFR-C-10
FCO
⚠ 5 issues flagged
SAFR-C-21
Org Effectiveness
⚠ 6 issues flagged

Owner sign-off 6

Category weights
Safety-gate policy
+4 scoring decisions

Published 3

Glossary
41 terms extracted
Roles
PD · Super · Tech
Videos
12 → CDN
The same approval queue handles document fixes, AI content updates, and improvement suggestions — one governance pattern. Safety and procedure changes route to the document owner specifically.

Asset Registry

The E-package goes in → the asset list comes out. Everything else hangs off it: LOTO, seals, test scope, turnover.

Core — buildable now
“The asset list is everything.” Sometimes the client hands you one — “but I have never seen an accurate one.” So we build it from the drawings, flag what we can’t verify, and carry it forward to the next building asking only what changed.

E-package intake

Building A · Rev 65%
Drawings for data centers always lag — we work from 65% and reconcile.

Extracted assets

awaiting extraction
assets
seals to track
LOTO points
need verification

One asset → four downstream consumers

the same record, read by every Dhabi company
SWGR-068-BSwitchgear · Zone 3
LOTO6 isolation points, 2 sources
Sealing10 tamper-proof seals
Test scope14 ITRs · megger, torque, P2P
Turnoverevidence package · system B
Every penetration a door could open gets a tamper-proof seal, and the seal count is a property of the asset — so the sealing procedure, the LOTO, and the test scope all derive from one accurate list.

The LOTO Table

Electrical room, at the equipment: the drawing, the manuals, the logs and the test — on one screen instead of a folding table

Core — buildable now
Scan the tag or let GPS place you, and the device already knows which asset you’re standing at, which procedure applies, and whether you’re qualified to do it.
SWGR-068-B · One-line
Sheet E-204 · Rev 65% · Zone 3
◎ located by QR
Power Control Grounding Labels
UTIL 13.8kV 52-M1 XFMR-6 · 13.8kV/480V BUS B · 480V 4000A
Tap two test points to set up a point-to-point check

Point-to-point

select 2 points

At hand

no folding table required
SAFR-C-15 Torqueopens at your step
Switchgear IB214 pp · searchable
Test historylast megger 412 MΩ
Active LOTO#2026-0418 · verified

Inspection & Test Record

Field measurement → live pass/fail vs the SAFR acceptance criteria → qualification-gated e-sign → turnover

Core — buildable now
E-2 Insulation Resistance (Megger)
1000 VDC
Asset SWGR-068-B · Busway Run B-12 · Zone 3 · Acceptance ≥ 100 MΩ
Measured value60 MΩ
Drag the reading — pass/fail checks live against spec.
Turnover — Busway System B
ITRs roll up to system completion + owner turnover, with punch items and hold points. A FAIL raises a punch and blocks turnover.

Digital Twin — DG-3

Point-and-know AR: layout, sequence-of-events, live instruments, guided repair, and a voice agent — built by SAFR (source-agnostic)

Vision — roadmap
● LIVE · as-built 3D twin
⎍ SAFR digital twin · optional CAD import
LayoutOperateInstrumentsRepair
Instructional clip · DG-3 start-up · 0:42
Ask the twin
AI · voice
Ask about DG-3 — start sequence, specs, or a fault. I'll answer and speak back.
Start sequenceSpecsFix a fault

Continuous Improvement

2 Second Lean engine · the platform studies how it's used and proposes waste reductions

Core — buildable now

AI-proposed improvements

awaiting human approval
The hard line: the AI never edits safety or procedure content on its own. It proposes; a person decides. Every decision is logged. Self-modifying production systems are not how a safety platform should work.
Developed & hosted by Taurus IQ